← All glossary terms

Data Center Design and Operations

2N+1

2N+1 means two complete systems plus an additional redundant component or capacity element. It is used where owners want both full duplication and extra component redundancy, but cost, space, and operational complexity increase sharply.

Explore more terms

Wastewater discharge

Wastewater discharge is the release of used water from cooling, treatment, sanitary, or process systems under permit or utility rules. Data centers using evaporative or water-cooled systems must understand discharge volume, chemistry, temperature, and treatment requirements.

Read definition →

Demand

Demand is the rate of electricity use over a defined interval, commonly measured in kW or kVA. Utilities often bill large customers based on the highest measured demand interval, not just total energy consumed.

Read definition →

Noise study

Noise study evaluates expected sound levels from generators, cooling equipment, transformers, construction, and operations. It can be central to community acceptance and permit conditions for data centers near residential or rural areas.

Read definition →