Long-lead equipment

Long-lead equipment is equipment with procurement timelines long enough to control project schedule. Transformers, switchgear, generators, chillers, and some electrical components can become gating items for data center delivery.

Talk to Volterra

Is this part of something you are working on?

Tell us which markets, sites or deals you are working on.

We respect your privacy. We use your information to respond to your inquiry. Optional ad measurement is controlled through Ad privacy. If this form will not send, email j@volterraadvisors.com.

Explore more terms

Single point of failure

A single point of failure is a component, path, control, or dependency whose failure can interrupt the service. Identifying these points is essential in both electrical design and commercial due diligence.

Read definition →

Due diligence period

Due diligence period is the time when a buyer or tenant investigates the property before becoming fully committed. For data centers, diligence should include power, title, survey, environmental, zoning, water, fiber, geotech, tax, and political risk.

Read definition →

N+1

N+1 means the system has the base capacity required for the load plus one additional redundant component or unit. It improves maintainability and resilience, but it is not the same as a fully duplicated system.

Read definition →