Ramp schedule
Ramp schedule is the contractual or operational timeline for adding capacity or load. In data centers, ramp schedules should align utility delivery, construction phasing, equipment procurement, commissioning, customer deployment, and billing obligations.
Read definition →Substation
A substation is a facility that switches, protects, transforms, meters, and controls power flows between grid elements or to a customer. For data center development, substation feasibility includes land, equipment, utility ownership, interconnection, transformer capacity, relay design, and schedule.
Read definition →Easement
Easement is a legal right to use another person's land for a specific purpose. Data center sites often need easements for transmission, distribution, fiber, access roads, drainage, water, and sewer infrastructure.
Read definition →