← All glossary terms

Data Center Design and Operations

Hyperscale

Hyperscale refers to very large data center deployments designed for cloud, AI, or platform-scale workloads. Hyperscale projects often drive utility-scale power discussions, long land-control timelines, custom substations, and phased campus delivery.

Explore more terms

Fuel consumption

Fuel consumption is the fuel used by generators or other equipment at a given load and runtime. It matters for backup duration, emissions, refueling logistics, testing cost, and emergency operations.

Read definition →

ITE

Information Technology Equipment includes servers, storage, network, and communications equipment. In power planning, ITE is the core productive load that the rest of the facility supports.

Read definition →

Critical load

Critical load is the IT or facility load that must remain powered to avoid service interruption. It drives UPS, generator, switchgear, distribution, and redundancy design more directly than total campus load.

Read definition →