Commissioning is the structured process of verifying that facility systems are installed, integrated, and performing as designed. It is critical for data centers because individual equipment tests are not enough to prove system behavior under failure or transfer scenarios.

Explore more terms

Coincident peak

Coincident peak refers to a customer's load during a larger system peak, such as a utility, RTO, or transmission-zone peak. It matters because some charges are assigned based on contribution to system peaks rather than the customer's own monthly maximum.

Read definition →

Electrical room

Electrical room is a dedicated space for switchgear, panels, transformers, UPS equipment, or distribution equipment. Room size, access, clearances, fire separation, cooling, and maintenance paths can constrain usable data hall planning.

Read definition →

Tier II

Tier II adds redundant capacity components but still generally requires shutdowns for some maintenance and has distribution-path exposure. It is a step up from basic capacity but not concurrently maintainable.

Read definition →