75 MW+ of power,
reserved for 2027.

A premier AI lab needs US sites with 75 MW or more of utility capacity already reserved, available in 2027, to take on a ground lease and build on with its own modular data center units. It can close quickly. Volterra is running the search: answering is free, and the tenant pays nothing.

Answers close Friday, December 18, 2026, 5 p.m. ET.
Every answer is reviewed, and we update you either way.

01 / THE REQUIREMENT

What we are
looking for.

Show the site and explain the power. Separate what is confirmed from what is assumed.

The tenant
A premier AI lab. It brings its own modular data center units, so it needs land and reserved power, not buildings, and it can close quickly.
Power
75 MW or more of utility capacity reserved for the site and available in 2027. Reserved means the utility has signed: a service or capacity agreement, a commitment letter, or a facilities study with a signed agreement. A place in the study queue is not a reservation yet.
Holder
Tell us who holds the reservation and how a ground tenant would take the power: assigned to the tenant, the landowner staying customer of record, or a sub-meter.
Land
Enough land to build at this load, zoned or zonable for data center use. Tell us the acres, the water and the fiber.
Terms
A ground lease of the land and the reserved power. Tell us the initial term you would offer, in years.
Market
Anywhere in the United States.
Also open
A larger site? Our 300 MW search is for 300 MW energized by June 30, 2027, zoned and entitled. A site can answer both, and we charge one fee on any one site.
Who pays
Answering is free and tenants pay nothing. If we introduce your site and you sign a lease with that tenant, the landowner pays Volterra 3% of the base rent over the initial term, at signing. You see and accept the full terms before any introduction.
Not a fit
Capacity still in study with no signed utility paper; behind-the-meter or on-site generation only; less than 75 MW at one site; power after 2027; sale only; built data halls or colocation space; sites outside the US.
NDA
Want an NDA first? Sign Volterra's mutual NDA: one page, already signed for Volterra, with no non-circumvention or fee terms. It is optional; answering never needs one.

02 / ANSWER THIS SEARCH

A few minutes.
One form.

Owners, developers, operators and authorized brokers are welcome. If your site fits, we will ask for the power evidence.

1 Every answer is reviewed. We update you either way, even if your site does not move forward.

2 If your site fits, we ask for the evidence.

3 The tenants we present sites to see yours without your name until you agree to an introduction, unless you tick the box to share it now.

Fields marked * are required. “Not yet confirmed” and “Unknown” are fine where they are true.

You
The site
Power
Can it serve a ground tenant? Choose all that apply *
Terms and context
Before you send

Please share nonconfidential information only. Submitting creates no NDA, representation agreement or commitment to transact. We may use your answers in counts-only market readouts, without your name or the site's location.