VOLTERRA CALL FOR SITES

300 MW, zoned, entitled,
energized by mid-2027.

A premier AI lab has a mandate from its leadership to secure one site with 300 MW energized by June 30, 2027, zoned for data centers and entitled, in the US or Canada. It brings its own modular data center units, will lease or buy the land, and can close quickly. Volterra is running the search: answering is free, and the tenant pays nothing.

Answers close Friday, December 11, 2026, 5 p.m. ET.
Every answer is reviewed, and we update you either way.

01 / THE REQUIREMENT

What we are
looking for.

Show the site and explain the power. Separate what is confirmed from what is assumed.

The tenant
A premier AI lab, acting on a mandate from its leadership. It brings its own modular data center units, so it needs land, power and approvals, not buildings, and it can close quickly.
Power
300 MW energized at the site by June 30, 2027: power already on, or a signed agreement or commitment letter from the utility with an energization date on or before that day and the utility's work under way. A place in the queue or a study does not count.
On-site generation
On-site generation can count toward the 300 MW only if its fuel is under contract and the equipment is being installed now, not waiting on an order. Utility power covers the rest.
Zoning and entitlements
Zoned for data center use today, or allowed by right, with the site plan or the key permits already approved. Rezoning or entitlements still in process are not a fit for this search.
Land
One site; contiguous parcels can combine. Tell us the acres, the water and the fiber.
Terms
A ground lease or a sale, your choice. Tell us the terms you would offer.
Market
The United States and Canada.
Also open
Not at 300 MW by June 30, 2027? If a US site has 75 MW or more of utility capacity reserved for 2027, our 75 MW search may fit. A site can answer both, and we charge one fee on any one site.
Who pays
Answering is free and tenants pay nothing. If we introduce your site and you sign a lease or a sale with that tenant, the landowner pays Volterra 3% of the base rent over the initial term, or 3% of the price. You see and accept the full terms before any introduction.
Not a fit
Less than 300 MW at one site by June 30, 2027; capacity still in study or without the utility's signature; on-site generation without contracted fuel or equipment being installed; rezoning or entitlements still pending; built data halls or colocation space; sites outside the US and Canada.
NDA
Want an NDA first? Sign Volterra's mutual NDA: one page, already signed for Volterra, with no non-circumvention or fee terms. It is optional; answering never needs one.

02 / ANSWER THIS SEARCH

A few minutes.
One form.

Owners, developers, operators and authorized brokers are welcome. If your site fits, we will ask for the power evidence.

1 Every answer is reviewed. We update you either way, even if your site does not move forward.

2 If your site fits, we ask for the evidence.

3 The tenants we present sites to see yours without your name until you agree to an introduction, unless you tick the box to share it now.

Fields marked * are required. “Not yet confirmed” and “Unknown” are fine where they are true.

You
The site
Power
Can the power serve a tenant or a buyer? Choose all that apply *
Terms and context
Before you send

Please share nonconfidential information only. Submitting creates no NDA, representation agreement or commitment to transact. We may use your answers in counts-only market readouts, without your name or the site's location.