The need
A partner brought us a requirement from a top AI lab: 2–4 MW of air-cooled capacity for a training workload, ready in the first half of 2027. The lab wanted to contract within weeks, would look outside the US, and could not have its name in the market.
What we did
On 15 November we turned the requirement into one public page and one form, with size, timing, cooling and terms stated plainly and no client name. One LinkedIn post carried it.
Every answer landed in one place, and we screened each against the requirement on six things: power, timing, size, site control, terms and entitlements. Each answer got one score out of 100 and a short note on what was still missing.
What came back
The post reached more than 10,000 people. Close to 30 answers came in from more than 20 operators, developers and owners, with sites in about two dozen states and countries, and nearly 9 in 10 of them arrived within 48 hours. About one in four scored 70 or more out of 100, and over half scored 50 or more.
What the client got
One ranked list instead of a pile of emails: each site with its score, what its owner reports on power and timing, and what is still open. When the lab widened what it would consider, every note was updated the same day.
Every responder hears where they stand, whether or not their site moves forward.
What we learned
- A specific, dated ask travels. Size and market in the first line reached more than 10,000 people from one post, and nearly 9 in 10 answers came within 48 hours.
- Screening is the product. About one answer in four scored 70 or more.
- Specifics decide. The sites that rise state their power status and a date plainly.
What happens next
The lab aims to contract before Christmas. We will add the outcome here when it does.