← All glossary terms

Land, Permitting, and Environmental

Phase I ESA

Phase I Environmental Site Assessment is a non-invasive environmental diligence review for recognized environmental conditions. It is a standard transaction step and can determine whether deeper Phase II testing is needed before closing or development.

Talk to Volterra

Is this part of something you are working on?

Tell us which markets, sites or deals you are working on.

We respect your privacy. We use your information to respond to your inquiry. Optional ad measurement is controlled through Ad privacy. If this form will not send, email j@volterraadvisors.com.

Explore more terms

Interconnection

Interconnection is the physical and electrical connection of a facility to the grid or to another electric system. For data centers, the term can refer to utility service connection, transmission-level large-load process, on-site generation connection, or fiber/network interconnection depending on context.

Read definition →

Build-to-suit

Build-to-suit is a development model where a facility is designed and delivered for a specific tenant or customer. It can align design with workload requirements but requires careful agreement on schedule, specifications, acceptance testing, and change control.

Read definition →

Cross connect

Cross connect is a dedicated physical or logical connection between two endpoints inside a data center or campus. It can connect customers to carriers, cloud on-ramps, other tenants, or internal network nodes.

Read definition →