← All glossary terms

Power Fundamentals

Load factor

Load factor compares average demand to peak demand over a period. Data centers often have high load factors because they run continuously, which can make energy use large even when load shape is relatively flat.

Talk to Volterra

Is this part of something you are working on?

Tell us which markets, sites or deals you are working on.

We respect your privacy. We use your information to respond to your inquiry. Optional ad measurement is controlled through Ad privacy. If this form will not send, email j@volterraadvisors.com.

Explore more terms

Powered land

Powered land is land whose value is driven by credible access to large-scale electric service. The phrase should be used carefully because entitlement, utility commitments, study status, cost allocation, timing, and physical interconnection can make "powered" claims vary widely.

Read definition →

Tier IV

Tier IV is fault tolerant and concurrently maintainable, meaning an individual equipment failure or distribution path interruption should not affect operations. It is the highest Uptime tier and typically implies higher cost, space, and operational rigor.

Read definition →

Suite

Suite is a dedicated private area within a data center, often larger and more customized than a cage. Wholesale customers may lease suites when they need dedicated power, cooling, security, and operations arrangements.

Read definition →