Capacity in service by date, from the phases of a ramp.
in service on a date = every phase delivered by that date, added up
share of full capacity % = in service ÷ all phases × 100
The calculator has not started: it needs JavaScript. The formula above is all it does.
Dates as planned. Utility delivery, construction and commissioning decide when a phase is really in service.
A screening estimate from the figures you typed. It is not an engineering study, a utility commitment or advice on a transaction.
In the glossary: Ramp schedule · Load ramp