Total facility load once cooling and losses are added.

facility MW = IT MW × PUE

The calculator has not started: it needs JavaScript. The formula above is all it does.

MW
1 or more

Result

Fill in every field with a number to see the result.

A screening estimate from the figures you typed. It is not an engineering study, a utility commitment or advice on a transaction.

In the glossary: IT load · PUE · Critical load